N PadmanabhanFounder and CEOPSG College of Technology. Signs every Altus drawing.Solar for homes
Your terrace can payyour power bill.
Up to ₹78,000 subsidy. Every approval filed for you.
- 3 kW from ₹1.79 lakh, after subsidy
- or about ₹2,080 a month
- 25-year warranty
What it costs
Prices, out in the open.
- 3 kW5 panels · 3.1 kWp₹1.79 lakhDCR panels, after the ₹78,000 subsidyor ₹2,080 a monthSuits about 800 units every two months
- Best value for most homes5 kW8 panels · 4.96 kWp₹2.79 lakhDCR panels, after the ₹78,000 subsidyor ₹3,240 a monthSuits about 1,250 units every two months
- 6 kW10 panels · 6.25 kWp₹3.18 lakhstandard panels, no subsidy: cheaper hereor ₹3,690 a monthSuits about 1,600 units every two months
- 8 kW13 panels · 8.125 kWp₹3.68 lakhstandard panels, no subsidy: cheaper hereor ₹4,270 a monthSuits about 2,050 units every two months
- 10 kW16 panels · 10 kWp₹4.17 lakhstandard panels, no subsidy: cheaper hereor ₹4,840 a monthSuits about 2,550 units every two months
Subsidy or not, we quote the cheaper way. The ₹78,000 subsidy needs DCR panels, which cost more. Up to 5 kW they still come out cheaper after the subsidy; from 6 kW standard panels without it cost you less. Your offer shows both.
Pay over time. Banks lend for home solar under the PM Surya Ghar scheme. The monthly figures above are at 7% over 10 years, often less than the bill they replace.
Or start from your bill
The Altus app
Our own design software, from your bill to the build.


- 01Your bill, read in our officePDFs and phone photos of EB bills are read on our own computers. They never go to an outside service.
- 02Sized to your useOn your daytime units, within your transformer, contracted demand and roof.
- 03Every part checkedString voltages, fuses, surge protection, cables, earthing and arresters, to IEC 62548 and the standards behind them.
- 04Drawings, BOM and price from one designDrawings signed by N Padmanabhan. What is checked is what is built.
- 05A plan back from your dateEvery part ordered so it is on site the day its stage starts.
Your project timeline
Switched on in 3 to 5 weeks. Just 4 of those days are on your roof.
Tap any bar. The chart shows the longer end of each stage; when TNPDCL approves quickly, switch-on comes about two weeks sooner. We file the day you approve the design, and we chase it.
The Altus units guarantee
Every unit guaranteed, in writing.
Your offer states the units your plant will make in a poor year: the P90 figure, which it should beat nine years in ten. If a year comes in more than 5% below it, we inspect the plant and put the cause right at our cost: parts, labour and our engineers’ time. It is a promise to fix, not a cash refund.
Worked out from your site’s own sunshine, temperatures and losses, and checked against our PVsyst reports. We have been engineering since 1984; we’ll be here to keep it.
- 25-year workmanship warranty
- Panels and inverters carry their makers’ warranties too.
- Approvals handled
- Net metering with TNPDCL and the PM Surya Ghar subsidy, filed the day you approve the design.
Projects
Homes, apartments, hospitals and mills.

Homes and terraces on our sites






What others say
Rated and written about.

Same engineers, new name
Confab Pumps since 1984. Altus Solar from 2026.
- 1982Our first megawatt-scale power plant commissioned
- 1984Confab Pumps begins in precision engineering
- 2015As Confab Pumps, a 2.2 MW solar pump tender
- 2026Altus Solar: the same team, a new name
N PadmanabhanFounder and CEOPSG College of Technology. Signs every Altus drawing.
Emmanuel FerdinandBoard AdvisorFormer VP, Siemens Renewable Energy; former MD and CEO, MAN Diesel & Turbo India.
Anirudh PadmanabhanMarketing OfficerGrowth, brand and the customer experience.Questions
What people ask us
Straight answers, worked from the same rules as our designs.
From our design software’s prices for a typical terrace, with GST: 3 kW about ₹1.79 lakh and 5 kW about ₹2.79 lakh after the ₹78,000 subsidy on DCR panels. From 6 kW, standard panels without the subsidy cost you less: 6 kW about ₹3.18 lakh, 8 kW ₹3.68 lakh and 10 kW ₹4.17 lakh. A battery adds to that. Your offer gives the exact figure, held for 30 days.
Start here
Send us your EB bill. We’ll send you a design.
Our figures, explained
- 25+ MW, 60+ plants: our own project list, homes to 4 MW ground plants, since our first solar work.
- Prices and monthly figures: our design software’s cost model for a typical terrace, with GST, November 2026; loans at 7% over 10 years.
- Subsidy: PM Surya Ghar (MNRE, February 2024): ₹30,000 a kW for 2 kW and ₹18,000 for the third, on DCR panels.
- Savings: TNERC tariff order 6 of 2025, TNPDCL’s network charges and 200 free units for homes; 1,480–1,560 units a year per kWp by town.
- P90 units: worked from the site’s sunshine, temperatures and losses, and checked against our PVsyst reports.
- Payback after tax: savings and upkeep taxed at 25%, with 40% depreciation on the written-down value.