- Size
- 2.5 MW
- Type
- Ground
- Year
- 2022–25
Built on the mill’s own land in two stages: 1.21 MWp in 2022, then 1.34 MWp in 2025 of bifacial panels raised over a white reflective membrane, anchored by hand into rocky ground. The membrane bounces light onto the panels’ backs.
20% → 75%
light reflected by the ground under the panels
5–8% more
units, measured on one inverter over three months
30+ years
the membrane’s rated life








